What's new on Bromcom

Latest changes, new features and improvements

all regions
v5.2025.3
wtimetable
April 07, 2025

wTimetable - Projects: Updates to Staff table in wizard

wTimetable > Projects

Several updates have been made to the Staff table in the Project wizard to improve accuracy in representing the workload of part-time and full-time staff, as well as to prepare for an upcoming release focused on part-time staff.

FTE (Full-Time Equivalent) field
  • A new FTE field has been added to Step 5: Staff in the Project wizard to accurately identify part-time and full-time staff.
  • Value Range & Formatting
        • The FTE field accepts values between 0 and 1, inclusive, with up to two decimal places (e.g., 0.25).
        • The default value for FTE is 1.00, and existing records will default to 1.00.
  • Manual Entry
        • Users can manually enter and update the FTE value for each staff member.
  • Updated Edit Staff table
        • The FTE field is now also available in the Edit Staff table via the Staff Side Panel > Edit Staff button on the Curriculum Plan and Scheduling pages.

Image #1

Bulk Edit Total Contact Time and FTE

This release also introduces the ability to bulk edit both Total Contact Time and FTE for staff members in the Project wizard.

Image #2

Key Features:

  • Users can select one or more staff members and click Set Total Contact Time/FTE.
  • The user can choose to update Total Contact Time, FTE, or both.
  • Users can then manually enter the desired number of hours and click Save.
  • A confirmation prompt will appear to confirm the action. Once confirmed, the Staff table will be updated, and a success message will be displayed.
Important Notes:
  • Total Contact Time must be entered as whole numbers.
  • FTE must be between 0 and 1, with up to two decimal places.
Image #3